Hazardous waste management

Identification, removal, and disposal of hazardous waste

发布时间:2024-04-22 发布者:

The total area of the industrial site is 20000 m ², adjacent to the Durance River, and there is a risk of polluting the river. The main waste on site includes powders, compacts, particles, and spindles made from magnesium, calcium, lithium, aluminum, and nickel (which react with water) as raw materials.


CURIUM Company has carried out preliminary safety control, developed an on-site construction safety plan, prepared for installation, implemented collective and individual protective equipment, and ensured on-site safety. CURIUM is also responsible for the identification, classification, and packaging of solid and water reaction waste.